CONCRETE JOURNAL Vol.51, No.5, May 2013
Japan Concrete Institute (JCI No.572)

contents


Special Issue: Hot Weather Concrete


Concrete is Charming
By H. Fujiwara

  1. Transition of Rules for Hot Weather Concrete
    1.1 Hot Weather Concreting in JSCE Standard Specifications for Concrete Structures "Materials and Construction"
    By H. Taniguchi, N. Sakata and H. Kawano
    1.2 Transition of Provisions on Hot Weather Concreting Case of Japanese Architectural Standard Specification
    By T. Koyama, H. Koyamada and K. Ito
    1.3 Application of JIS A 5308 : 2009 "Ready-mixed Concrete" in Tokyo
    By S. Arai, K. Miyachi, M. Negishi and T. Ito
  2. Efforts on Application in Hot Weather Concrete
    2.1 Measures of Hot Weather Concreting and Quality of the Concrete in Kyushu
    By T. Otani, K. Ueda, Y. Sato and T. Koyama
    2.2 Creating "Manual for Application in Hot Weather Concreting" of Architectural Construction in the Kinki District
    By J. Yamasaki, T. Iwashimizu, M. Kurinobu and S. Nakamura
  3. Efforts for Failure Case to Consider in Ordering and Supervisor
    3.1 Dealing with Hot Weather Concrete for Supervisors
    By K. Kondou
    3.2 Countermeasures of Concrete Defect of the Expressway
    By Y. Kamihigashi
    3.3 Investigate of Concreting Procedure and Construction Management
    By G. Koizumi
  4. Efforts of Manufacturers of Material and Equipment
    4.1 Temperature of Cement
    By T. Onishi and I. Yoshitake
    4.2 The Action of the Chemical Admixture for the Hot Weather Concreting
    By M. Higaki
    4.3 Cooling System for Water for Mixing Fresh Concrete
    By R. Yasuda
  5. Measures under Hot Weather Environment for Production and Transport of Ready-Mixed Concrete
    5.1 Temperature of Ready Mixed Concrete and Applicable Period of Hot Weather Concreting under Global Warming
    By H. Koyamada, T. Koyama, K. Ito and S. Harada
    5.2 Measures of Ready-Mixed Concrete Manufacture in Hot Weather
    By S. Ishida
    5.3 A Cooperative Study on Water Cooling System for Truck Agitators using Wing-tip Vortex
    By R. Kawamura
  6. Measures under Hot Weather Environment for Construction and Curing
    6.1 Placing and Curing of Hot Weather Concrete in Public Works Construction
    By N. Sakata, S. Yanai, G, Sakai and Y. Nakatani
    6.2 Placing and Curing of Hot Weather Concrete in Building Construction
    By H. Jinnai
    6.3 Construction of Highway Viaduct in Dubai
    By M. Ohno

To Pagetop