CONCRETE JOURNAL Vol.49, No.1, Jan. 2011
Japan Concrete Institute (JCI No.544)
contents
Special Issue: State-of-the-art Projects for Next Generation
- Mission of JCI
- By Y. Masuda
- Overview
- 1.1 Expressway Bridges to Support the Next Generation
- By S. Ikeda
- 1.2 Shinkansen Network under Construction and Concrete Structures for Railways
- By J. Niwa
- 1.3 Infrastructure Construction Project in Underground towards Super Safety City
- By T. Inada
- Demands in Projects for Next Generation
- 2.1 Planning and Design Concept of Expressway Bridge for Next Generation
- By Y. Inokuma
- 2.2 Structure Planning for Shinkansens
- By M. Ikuma and M. Naito
- 2.3 New Tomei Leading Project-With the Aim of "One of the World's Leading Expressway System" Based on Cooperation among People, Vehicles, and Roads-
- By T. Iizuka, H. Mizukami, K. Oya and R. Gejima
- 2.4 Seismic Measures of Tokaido-Shinkansen
- By H. Muramatsu
- New Tomei Expressway(Gotemba JCT-Inasa JCT)
- 3.1 New Tomei Expressway(Gotemba JCT-Inasa JCT)
- By I. Tanaka, N. Watanabe, Y. Ito, T. Nakajima, K. Saito and A. Nakamura
- New Tomei Expressway(Inasa JCT-Toyota JCT)
- 4.1 New Tomei Expressway(Inasa JCT-Toyota JCT)
- By S. Sakai, M. Ohta, K. Nakatsumi, H. Nagumo and H. Abe
- Tokyo Sky-Tree
- 5.1 Outline and Concrete Technology of Tokyo Sky-Tree Construction Project
- By N. Sugimoto, M. Suzuki, T. Sakai and Y. Koshiro
- Metropolitan Expressway Central Circular Route
- 6.1 Outline of the Long and Large Section Tunnel in the Metropolitan Expressway-Open of the Yamate Tunnel and Outline of the Central Circular Shinagawa Route-
- By M. Osada, D. Miyama and M. Shimonishi
- 6.2 The Application of Fire-resistant RC Segment in Central Circular Shinagawa Route
- By Y. Ishiguro and Y. Suzuki
- Planned Shinkansen
- 7.1 Concrete Technologies for Shinkansen Construction
- By Y. Tadenuma, S. Tamai and O. Maruyama
- 7.2 Construction of Viaduct in Kyushu-Shinkansen-Construction of Neighboring Conventional Line-
- By H. Hagiwara, T. Fujimoto and K. Tateishi
- 7.3 Concrete Road Beds on Snow-storing Type Viaducts to Function as Main Girders-Hokuriku Shinkansen Line-
- By T. Santo
- 7.4 Development of High Performance Concrete for New Tunneling Method 'SENS'
- By M. Hasegawa, M. Noguchi and T. Tamai
- Runway D at Haneda Airport
- 8.1 Outline of D Runway Construction Project at Haneda Airport
- By T. Saeki
- 8.2 Production and Construction of Precast Slab for the Piled Elevated Platform
- By K. Nango
- 8.3 UFC Slab for the Piled Elevated Platform
- By K. Yokoi
- 8.4 High Speed Construction of Piled Elevated Platform
- By S. Ohno, N. Takeda, T. Hirata and M. Hashimoto
- 8.5 Steel Pipe Sheet-pile Cellular Seawall Connecting Reclamation Area and Piled-Elevated Platform
- By H. Tanaka, T. Yamamoto and Y. Niihara
- Preservation and Restoration of the Tokyo Station Building
- 9.1 Preservation and Restoration of the Marunouchi Tokyo Station Building
- By M. Kamata and N. Ozawa