* Reproduction of images without author's permission is prohibited.
1. Amakusa City Hall |
2. ARTEPIA Yasugi General Culture Hall |
3. ASAHI KOGYOSHA Head Office |
4. Boltun Headquarters Building |
5. Heijokyu Izanai-kan |
6. Hokkaido University of Science Central Building(E Building) |
7. KAMA CITY HALL |
8. KANDA HOLDINGS Headquarters |
9. KASHIYAMA DAIKANYAMA |
10. Mie Prefectural Stadium |
11. The National Stadium |
12. Nippon Rietec General Training Center |
13. Okata Port Passenger Terminal / Tsunami Evacuation Facility |
14. Art Museum & Library, Ota |
15. Rever Holdings Ryogoku |
16. Ryukoku University Jojukan |
17. SHOGAKUKAN-Building |
18. Tenri Station Plaza CoFuFun (CoFuFun) |
19. Tochigi Stadium |
20. Tokyo College of Music Naka-Meguro Daikan-yama Campus |
21. Waseda University Honjo Senior High School Gymnasium |
22. Aso Ohashi Bridge |
23. Bessodani Bridge |
24. Egawa Bridge |
25. Hosotsubo Bridge |
26. Package 2: Extradosed Bridge Section |
27. Komono Second Viaduct |
28. Natsui Viaduct |
29. Onahama Marine Bridge |
30. Shin-Gotemba Viaduct on Shin-Tomei Expressway |
31. Shiokawa Bridge on the Shin-Meishin Expressway |
32. Washimi Bridge |
33. Yaga Overpass Bridge |
34. Yobaisan Viaduct on Shin-Meishin Expressway |
35. Yamanashi Press and Broadcasting Center |
36. Kamitagawa Bridge |
37. Kirigataki Bridge on the Shin-Meishin Expressway |
38.Michitanidaini Bridge |
39. Deck Slab Replacement on The Moriguchi Route of the Hanshin Expressway |
40. Renewal Project for the Samezu Section of Tokyo Metropolitan Expressway Route No. 1 Haneda Line (Phase 1) |
41. Improvement Work for the Keio Inokashira Line and Shimokitazawa Station |
42. Disaster Recovery Works between the Shingu and Otoyo Interchanges |
43. Outline of “Non-Destructive Inspection Device for Inspection of Stay Cables” |
44. Development of a Geosynthetic-reinforced Soil Integrated Bridge with Prestressed-concrete T-shaped Girders |
45. Shinanobashi Rampway Bridge on the Hanshin Expressway |
46. Shortening of Construction Period and Improvement of Productivity by Applying the Large-scale Precast Method in the Construction of a Prestressed Concrete Liquefied Natural Gas Tank |